Book or Quote a Job.
Use the form below to book your job with TMC Ltd or quotes can also be completed here.We invite you to share your thoughts, feedback, and wishes through a survey. Click the start survey to begin. START SURVEY
Service Booking form - reference #03019
Fields marked with an asterisk are required
Note that councils and NZTA require 5 working days notice from time the TMP (Traffic Management Plan) is submitted to them for new TMP jobs. This is after we have designed and drawn up your TMP which can take 1-3 days. If there is a preapproved TMP supplied or using Generics this can sometimes be less. If you are getting a quote only but know that job will go ahead, we can prepare your TMP in advance if you inform us of that - even if you don’t have final dates. We can then get your TMP signed off with window dates, accelerating the process for when you do have final dates.
-
Start typing the address and select it from the dropdown.
Selecting a new address will clear existing markers and shapes. -
Add markers and shapes to the map using the toolbar in the center.
Zoom in as far as you can to show exactly where the work will take place. Use the shape tool to draw the boundaries of your work-site.
Please note we will work this out for you and detail on the TMP and inform you once you have submitted this request, but if you have an idea you can suggest and we can correct if not adequate.
Note any drop zones as well if required. These details are so we can allow enough room for you, plus traffic and pedestrians.
New TMPs must be submitted 5 working days in advance to the RCA/Council, in addition to the time it takes us to draw up your plan.
Note tell us the time you first arrive onsite, we will gauge and be setup by this time. This is important so we can sign in your staff. On State Highways and main arterial roads restrictions may apply for lane closures and speed restrictions, typically this is 9am-4pm (we will inform you if your times clash when we consult with council/NZTA).
If so a Letter Drop may be required, and ODT advertising with normally 3-4 weeks notice. If any properties/businesses are affected then let us know if you will be providing this or require us to undertake. If you have already made contact with the DCC Events team let us know.
An excavation permit is required for all excavations on the road reserve. This may also be called an excavation Corridor Access Request (CAR) or a Works Access Permit (WAP). This excavation permit is in addition to an approved TMP.
TMC can request this for you, or you can lodge this yourself via Submitica – please provide the CAR number if you have done this yourself. You must supply information on trench/excavation locations, design plans and any authorisation letters (e.g. letter of approval for new vehicle crossing) if TMC is submitting for you. You must also ensure you are a council approved contractor.
Please note for new services on State Highways, a Deed of Grant is required before an excavation permit can be issued. This must be completed by the land-owner.
It remains the client’s responsibility to take any further actions required based on the information we forward to them.
If using your own fences they must comply with COPTTM specifications.
Note if on Pay & Display metered DCC parking and for long durations DCC may charge fees for these types of jobs in the CBD (we will inform you if so).